Skip to content
AnalystLens

CRH PUBLIC LTD CO 8-K Report, Mine Safety Disclosure (Dec 10, 2024)

Reports
Other Events
Filing Date
Filed December 10, 2024
Period End
December 10, 2024
Security
CRH
In the record · 2016–202610-K810-Q08-K592

CRH filed 8 annual reports (10-K), 0 quarterly reports (10-Q) and 592 current reports (8-K) between 2016 and 2026.

  1. FY2020 annual report10-K · Mar ’21Mar ’21

Summary

Summary of the 8-K filed December 10, 2024. Cited figures are marked; the original filing is the authoritative source.

CRH Public Ltd Co (CRH) filed an 8-K on December 10, 2024, reporting a mine safety event at its Cape Sandy Mine #1 in Leavenworth, Indiana.

On November 12, 2024, a subsidiary received an "imminent danger" order from the Mine Safety and Health Administration (MSHA) due to a mechanic being positioned under a suspended load. This situation, while posing a risk of injury, resulted in no actual harm, as corrective action was promptly taken and the mechanic moved from the hazardous area. The MSHA order was terminated following these immediate actions.

Key Highlights

  1. CRH subsidiary's Cape Sandy Mine #1 received an MSHA "imminent danger" order on November 12, 2024.
  2. The order was issued under Section 107(a) of the Federal Mine Safety and Health Act of 1977.
  3. The hazard involved a mechanic being located under a suspended load.
  4. Corrective action was taken immediately upon notification of the order.
  5. No injuries occurred as a result of the cited incident.
  6. The MSHA order was terminated after the mechanic moved from under the suspended load.

Frequently Asked Questions

  1. What was the nature of the mine safety event reported by CRH?

    CRH reported an "imminent danger" order issued by the Mine Safety and Health Administration (MSHA) at its Cape Sandy Mine #1. The order was triggered because a mechanic was found under a suspended load, which posed a risk of injury.

  2. Did anyone get injured during this incident?

    No, thankfully, no one was injured. Corrective action was taken immediately, and the mechanic moved away from the suspended load, resolving the immediate danger.

  3. What was the outcome of the MSHA order?

    The MSHA order was terminated. Once the corrective action was taken and the mechanic was no longer under the suspended load, the mine was deemed to be in compliance, and the order was lifted.

  4. Is this a significant operational issue for CRH?

    Based on the filing, the incident was addressed immediately with corrective actions, and the MSHA order was terminated without injury. While a safety violation, the swift resolution suggests it may not represent a significant ongoing operational disruption.