Skip to content
AnalystLens

Alliant Energy 8-K Report, Material Agreement (Oct 28, 2026)

Reports
Material Agreements·Financial Events·Exhibits & Filings
Filing Date
Filed October 28, 2026
Period End
October 26, 2026
Security
LNT
In the record · 2016–202610-K1110-Q338-K136

LNT filed 11 annual reports (10-K), 33 quarterly reports (10-Q) and 136 current reports (8-K) between 2016 and 2026.

  1. Material agreement8-K · May ’17May ’17
  2. Leadership change8-K · Dec ’19Dec ’19
  3. Material agreement8-K · Mar ’22Mar ’22
  4. Leadership change8-K · Jan ’26Jan ’26

Summary

Summary of the 8-K filed October 28, 2026. Cited figures are marked; the original filing is the authoritative source.

On October 26, 2026, Wisconsin Power and Light Company (WPL) and Interstate Power and Light Company (IPL), both wholly owned subsidiaries of Alliant Energy Corporation, entered into loan guarantee agreements, note purchase agreements, and future advance promissory notes with the U.S. Department of Energy under the DOE Loan Guarantee Program established under Title XVII of the Energy Policy Act of 2005.

The filing states that Alliant Energy Corporation is not a party to, and has no direct obligations under, these Loan Documents, and that each subsidiary has no obligations under the other's documents. Under the facilities, WPL may borrow up to $1,626,488,000 and IPL up to $3,500,000,000a through the Federal Financing Bank to reimburse up to 80% of eligible project costs for projects such as generation, transmission, substations, energy storage and grid resilience technologies. Borrowings are full recourse, senior unsecured obligations of each subsidiary, with a scheduled final maturity of May 15, 2056.

Each advance bears interest at a U.S. Treasury rate plus 37.5 basis points, and the availability period runs until the earliest of September 15, 2033, the maximum loan amount being reached, or termination. The agreements contain customary covenants and events of default, including compliance with DOE Program Requirements, and mandatory prepayment provisions tied to eligible project status, a 95%b regulatory cost recovery threshold, and changes in control (35% or more beneficial ownership of the borrower). The filing also notes that advances are conditioned on items such as completion of DOE environmental review, receipt of state regulatory approvals, and confirmation of investment grade credit ratings.

Key Highlights

  1. WPL and IPL entered into DOE Loan Guarantee Program agreements with the Federal Financing Bank on October 26, 2026.
  2. WPL's maximum guaranteed loan amount is $1,626,488,000; IPL's is $3,500,000,000.
  3. Advances reimburse up to 80% of eligible project costs for energy infrastructure, transmission, storage and grid reliability projects.
  4. Borrowings are full recourse, senior unsecured obligations of each subsidiary, with final maturity on May 15, 2056.
  5. Interest on each advance is set at the applicable U.S. Treasury rate plus 37.5 basis points.
  6. Alliant Energy Corporation is not a party to and has no direct obligations under the Loan Documents.
  7. Mandatory prepayment and covenant provisions include a 95% regulatory cost recovery threshold and a change of control trigger at 35% beneficial ownership.

Frequently Asked Questions

  1. Is Alliant Energy Corporation itself liable for these loans?

    No. The filing states the Company is not a party to, and has no direct obligations with respect to, the Loan Documents. The borrowings are obligations of WPL and IPL respectively.

  2. How much can each subsidiary borrow under these facilities?

    WPL may borrow up to $1,626,488,000 and IPL up to $3,500,000,000 in aggregate advances under their respective credit facilities.

  3. What projects are the proceeds intended to fund?

    Proceeds reimburse up to 80% of eligible project costs for projects eligible under the DOE Loan Guarantee Program, including nuclear, coal, oil, natural gas, geothermal or hydropower generation, new and upgraded transmission, substations, energy storage and other grid reliability or resilience projects.

  4. When do the loans mature and how is interest set?

    The scheduled final maturity for all borrowings is May 15, 2056. Each advance bears interest at a rate equal to the applicable U.S. Treasury rate plus 37.5 basis points, with interest payable each May 15 and November 15.

  5. What could force early repayment?

    Mandatory prepayments may be required if a project ceases to be eligible, certain termination events occur, approved cost recovery falls below the 95% threshold, preliminary projects do not become eligible within 24 months, or a change in law occurs. A change of control, defined to include a person or group acquiring 35% or more of the borrower's voting power, also triggers a prepayment offer.